Difference between revisions of "User:Khannatanmai/GSoC2020Progress"

From Apertium
Jump to navigation Jump to search
Line 7: Line 7:
 
== Application Review Period (March 31 - May 3) ==
 
== Application Review Period (March 31 - May 3) ==
 
* Document all the proposed benefits with including secondary information
 
* Document all the proposed benefits with including secondary information
  +
* Document the change needed in tokeniser, bidix lookup, and generation to include surface form
 
 
= Completed =
 
= Completed =
 
== Application Review Period (March 31 - May 3) ==
 
== Application Review Period (March 31 - May 3) ==
Line 16: Line 16:
 
* Document how much change is needed in which parsers and what the change is
 
* Document how much change is needed in which parsers and what the change is
 
* Proof of Concept for the new format
 
* Proof of Concept for the new format
 
* Document the change needed in tokeniser, bidix lookup, and generation to include surface form: [[User:Khannatanmai/Eliminating_Dictionary_Trimming]]

Revision as of 18:05, 2 May 2020

Work Plan: http://wiki.apertium.org/wiki/User:Khannatanmai/GSoC2020Proposal_Trimming#Work_Plan

To Do

Application Review Period (March 31 - May 3)

Ongoing

Application Review Period (March 31 - May 3)

  • Document all the proposed benefits with including secondary information

Completed

Application Review Period (March 31 - May 3)