GSoc Progress
Work Done
- Read the Documentation fully *
Work Plan
Community Bonding Period (May 6 - May 27)
- Understand the Apertium pipeline fully
- Modify and Understand individual files
- Get familiar with the files that I need to modify
- Formalise the problem, limit the scope of anaphora resolution (To Anaphora needed for MT)
- Flowchart of the proposed system
- Write Pseudocode for identifying Salience Factors
- Study the EuroParl corpus and see which anaphors the method will be able to resolve on paper
- Explore Constraint Grammar and use it if it proves to be beneficial
Week 1 (May 27)
- Automatic Annotation of anaphora for evaluation (EuroParl Corpus)
- Implement a preliminary scoring system for antecedent indicators [work for Spanish-English and Catalan-English for now]
- Decide on a definite context window
Week 2 (June 3)
- Implement Basic Anaphora for Possessive Pronouns in C++
- Create a transfer-pattern-like file as a way to mark possible NPs as antecedents.
- Implement transfer rules for Possessive Pronouns
- A basic prototype ready
- TEST the prototype with the pipeline
Week 3 (June 10)
- Implement Basic Anaphora for Reflexive Pronouns (On Verbs) [For Spanish and Catalan]
- Implement Basic Anaphora for Zero Pronouns (On Verbs) [For Spanish and Catalan]
- Implement transfer rules for the above
- TEST the system extensively
- Document the outline
Week 4 (June 17)
- Implement the system to work out all possible antecedents
- Add ability to give antecedents a score
- TEST basic sentences with single antecedents, Test the pipeline
- Test and Evaluate for Possessive, Reflexive, Zero Pronouns in Spa-Eng pair
- Test and Evaluate for Possessive, Reflexive, Zero Pronouns in Cat-Eng pair
Deliverable #1: Anaphora Resolution for single antecedents, with transfer rules [The full pipeline]
Evaluation 1: June 24-28
Week 5 (June 28)
- Implement Antecedent Indicators:
- Implement Code to Identify Boosting Indicators
- Implement Code to Identify Lappin and Leass Indicators (as many as possible)
Week 6 (July 4)
- Code to Identify Impeding Indicators
- Code to Identify Adjective Agreement Antecedent
- Implement transfer rules for agreement in adjectives for Cat-Eng & Spa-Eng
- Code to remember antecedents for a certain window
- Give scores to the antecedent indicators
Week 7 (July 10)
- Implement detection of remaining salience features
- Implement remaining transfer rules for anaphora in pronouns Cat-Eng & Spa-Eng
- Code Salience Indicators & Implement tie breaking systems
- Modify the scoring system based on performance in the pairs
- TEST system with French and Russian.
Week 8 (July 16)
- Implement fallback for anaphora (in case of too many antecedents or not past certainty threshold)
- TEST Scoring System
- TEST and Evaluate current system and produce precision and recall
- TEST and Evaluate Agreement for Adjectives
- TEST system with Turkish and any other required language pairs.
- Document Antecedent Indicators, Scoring System, Fallback for Cat-Eng & Spa-Eng
Deliverable #2: Anaphora Resolution with saliency features detection, scores, and a fallback mechanism
Evaluation 2: July 22-26
Week 9 [OPTIONAL: If current system not producing good enough results]
- Implement Expectation-Maximization Algorithm using monolingual corpus
- Compare with current system
- Test EM Algorithm and the implemented system
Week 9 [NOT OPTIONAL] (July 26)
- Implement code to ignore embedded clauses
- Evaluate increase in detection
- Insert into Apertium pipeline
- Implement code to accept input in chunks and process it
Week 10 (August 1)
- EXTENSIVELY TEST final system
- Test with French, Russian, Turkish, Galician, etc.
- Evaluate and find out which features are language agnostic
- Decide on list of features for agnostic anaphora and for language specific anaphora
Week 11 (August 7)
- Any remaining coding and improving the system
- TEST on multiple pairs and give Evaluation Scores
- TEST for backwards compatibility and ensure it
Week 12 (August 13)
- Wrap up on the final module
- Complete the overall documentation with observations and future prospects
Final Evaluations: August 19-26
Project Completed
NOTE: Week 11 and Week 12 have extra time to deal with unforeseen issues and ideas